Design-and-Build vs Traditional Contracting in Kenya: Which Is Right for You?

By Msingi Engineering Group Updated 9 min read

Exposed timber roof structure with a skylight inside a villa at Tatu City.

Before you build in Kenya, you have to decide how the work will be bought, not just who will build it. The two most common routes are design-and-build, where one firm designs and constructs, and traditional contracting, where a separate design team completes the drawings before a contractor is chosen. This guide explains how each route works in Kenya, who carries which risks, and how to decide which suits your project.

Key takeaways

  • Traditional contracting (also called design-bid-build) separates design from construction: your consultants design and specify, then contractors bid on the finished design.
  • Design-and-build puts design and construction under one contract and one accountable firm, so the client does not have to coordinate separate parties when problems arise.
  • Internationally, the FIDIC Red Book is used where the employer provides the design, and the FIDIC Yellow Book where the contractor designs and builds.
  • In Kenya, both routes still need NCA-registered contractors, registered architects and engineers, approved drawings and NCA project registration.
  • Neither route is always cheaper. The main cost risks on both are an unclear brief and changes made after work starts.

What is traditional contracting in Kenya?

In the traditional route, you, the client (called the employer in most contracts), appoint a team of consultants first: an architect, a structural engineer, often MEP (mechanical, electrical and plumbing) engineers, and a quantity surveyor (QS). They prepare the full design and a bill of quantities (BQ), a document that lists every item of work with its measured quantity. Contractors then price that BQ, and you award the building contract, usually to the best-value bid.

During construction, your consultants act for you. The architect typically administers the contract, the QS values work for interim payments and prices changes, and the engineers inspect the structure and services.

For private building projects in Kenya, the Joint Building Council (JBC) agreement and conditions of contract for building works, often called the JBC "Green Book", is a widely used standard form, alongside FIDIC contracts for larger work (Cliffe Dekker Hofmeyr).

What is design-and-build?

In design-and-build, you sign one contract with one firm that is responsible for both the design and the construction. You set out what you need in a brief, often called the employer's requirements: the number of rooms, the floor area, the finishes, the budget and the timeline. The contractor develops the design, obtains approvals with its registered professionals, and builds.

FIDIC, the international federation of consulting engineers whose standard contracts are used in many countries, publishes separate forms for each route. Its Red Book is intended for works where the employer is responsible for the design, while its Yellow Book (Plant and Design-Build) is used where the contractor designs, and is a lump-sum contract in which the contractor carries the quantity risk, according to Pinsent Masons.

Design-and-build firms come in two broad types:

  • Integrated firms have architects and engineers in-house or in a long-standing team, so design and construction are planned together from the first sketch.
  • Novated arrangements start with the client's own consultants, whose appointments are later transferred to the contractor once the contract is signed.

How do design-and-build and traditional contracting compare?

Factor Traditional (design-bid-build) Design-and-build
Number of main contracts Several (each consultant plus the contractor) One
Who is responsible for design faults Generally the client's design consultants The design-and-build contractor
Speed to start on site Slower: design must be finished before tender Faster: design and planning can overlap
Price certainty at signing Good if the design is complete and the BQ accurate Good if the brief is clear and the contract is lump sum
Client control over design detail High: your consultants work only for you Lower once the contract is signed, unless the brief is detailed
Independent oversight Built in through your consultants You may want to appoint your own reviewer
Cost of changes after signing Priced as variations by the QS Priced as changes to the brief; can be costly
Buildability input during design Limited: the contractor joins after design Strong: the builder shapes the design
Best suited to Complex or one-off designs where you want full control Clients who want one accountable team and a faster start

What are the advantages and risks of design-and-build?

The main advantages, as summarised by the construction reference site Designing Buildings, are:

  • One point of responsibility. If the roof leaks or a wall cracks, you do not have to work out whether it is a design fault or a construction fault. The same firm answers for both.
  • Speed. Design, approvals and site preparation can overlap rather than run one after another.
  • Buildability. The people who will build the house help shape the design, which can reduce redesign and waste.
  • Cost risk transfer. On a lump-sum contract, the contractor carries more of the risk of quantities being wrong.

The risks are real too:

  • Quality can drift if your brief and specifications are vague, because the contractor may choose cheaper options that still meet the wording.
  • Changes after signing are priced by the contractor and can be expensive.
  • Less independent advice. Your design team works for the contractor, not for you, so you may want your own QS or engineer to review key stages.

What are the advantages and risks of the traditional route?

According to Designing Buildings, the main strength of the traditional route is certainty: because the design is finished before contractors are appointed, you know what you are buying and roughly what it will cost. You also have independent consultants working only for you, and you can still make changes during construction through formal variations.

The drawbacks are time and coordination. The process is usually slower, the contractor cannot improve buildability because it joins after design, and many changes to the design during construction can push costs up. You also manage several contracts, and when something goes wrong, the designer and builder may each blame the other.

Which approach suits which project in Kenya?

Your situation Route that often fits Why
Family home on an eighth- or quarter-acre plot, standard layout Design-and-build One accountable team, faster start, design shaped around build cost
Highly bespoke architect-led home Traditional Full design control before you commit to a builder
Building from abroad with limited time to manage people Design-and-build One contract and one point of contact
Large or complex project with public or institutional funding Whichever route the funder's procurement rules require Formal tendering and independent supervision
Refurbishment of an existing house Either, depending on how much redesign is needed Simple works suit design-and-build; heavy redesign suits traditional

If you are building from outside Kenya, our guide to building a house in Kenya from the diaspora covers the extra safeguards you need on either route.

What Kenyan rules apply whichever route you choose?

The procurement route does not change your legal obligations.

The contractor must be NCA registered. Section 15 of the National Construction Authority Act, 2011 makes it an offence to carry on business as a contractor without NCA registration. Check the firm, its category and its practising licence using our guide on how to check if a contractor is NCA registered.

Conflicts of interest must be declared. Section 17(3)(b) of the same Act allows NCA to refuse registration to a member of a consulting firm providing architectural, quantity surveying or engineering services unless they declare the interest, and it says they should not act as both consultant and contractor on the same project unless that is expressly specified. Design-and-build arrangements should therefore be clearly set out in the contract.

Professionals must be registered. Architects and quantity surveyors register with the Board of Registration of Architects and Quantity Surveyors (BORAQS) under the Architects and Quantity Surveyors Act. Engineers register with the Engineers Board of Kenya (EBK), which since December 2025 has required engineers to register projects on a portal before taking drawings to the county, reported AllAfrica.

The project must be registered with NCA. NCA project registration requires a licensed contractor, consultants with valid practising licences, approved architectural and structural drawings and planning approvals, according to Construction Kenya. Our guide to building plan approval in Nairobi explains the county steps.

How do you protect yourself on a design-and-build contract?

  1. Write a clear brief. List rooms, sizes, finishes, fittings and must-haves. The more specific the brief, the less room for cheaper substitutes.
  2. Agree what the price includes. Ask for a priced breakdown or bill of quantities, even on a lump-sum contract, so changes can be valued fairly.
  3. Sign off design stages. Approve concept, approval drawings and final working drawings in writing before the next stage starts.
  4. Tie payments to completed work. Link each payment to a stage of construction that has been inspected.
  5. Agree how changes are handled. Every change should be priced and approved in writing before the work is done.
  6. Consider independent review. For a larger project, a QS or engineer working only for you can review key stages.
  7. Agree handover terms. Set out the defects liability period, retention, warranties and as-built drawings.

Our guide to avoiding construction cost overruns covers BQs, contracts and payment milestones in more depth.

How Msingi can help

Msingi Engineering Group (Msingi), the trading name of Msingi Africa Ltd, is an integrated engineering, design-build and property development company in Nairobi. Architecture, structural engineering and MEP are coordinated by one accountable team, and Msingi is registered with the National Construction Authority as a building works contractor with a current annual practising licence.

For families who want a predictable route, Msingi's Family Typology homes are standard, fully engineered prototype homes for eighth-acre and quarter-acre plots, from 150 m² to 400 m². We work to clear scopes, defined costs, realistic timelines and direct progress updates, and we have delivered more than 20 projects. Tell us about your plot and plans.

Frequently asked questions

What is a design-and-build contract in Kenya?

A design-and-build contract is a single agreement under which one firm both designs and constructs the building. The client sets out requirements such as size, rooms, finishes and budget, and the contractor develops the design, obtains approvals through its registered professionals and builds. The contractor is responsible for both design and workmanship, giving the client one point of responsibility.

Is design-and-build cheaper than traditional contracting?

Not automatically. Design-and-build can save time and reduce redesign because the builder shapes the design around buildability and cost. Traditional contracting lets several contractors bid on a finished design, which can sharpen prices. On both routes, the biggest cost risks are an unclear brief and changes made after work starts, so a clear scope matters more than the route.

Who is responsible for design mistakes in design-and-build?

Under a design-and-build contract, the contractor is generally responsible for the design it produces, as well as for construction. This is the main difference from the traditional route, where the client's own consultants are responsible for the design. Your contract should state clearly what design responsibility the contractor carries and what happens if the brief you supplied contains errors.

Do I still need an architect and engineer in design-and-build?

Yes. The design must still be prepared and signed by registered professionals for county approval and NCA project registration. In design-and-build they are part of, or appointed by, the contractor's team rather than appointed directly by you. You may also choose to appoint your own quantity surveyor or engineer to review the design and the work on your behalf.

What contract forms are used for building in Kenya?

For private building projects, the Joint Building Council (JBC) agreement and conditions of contract for building works is widely used, alongside FIDIC contracts on larger construction and infrastructure projects. FIDIC's Red Book is for employer-designed works, and its Yellow Book is for contractor-designed works. Whatever form you use, have an advocate review it before you sign.

Can I switch from traditional to design-and-build halfway?

It is possible but can be complicated. If your consultants have already prepared drawings, a contractor may take over the remaining design under a novation agreement, or simply build to your consultants' design. Agree in writing who is responsible for the existing drawings, who owns them and who pays for any redesign, and take legal advice before signing.